par De Meulenaere, Roeland;Maertens, Tim;Sikkema, Ale;Brusletto, Rune;Barth, Tanja;Blondeau, Julien
Référence Energies, 14, 22, 7720
Publication Publié, 2021-11
Référence Energies, 14, 22, 7720
Publication Publié, 2021-11
Article révisé par les pairs
Résumé : | This paper aims at assessing the impact of retrofitting an existing, 730 MWe, coal-fired power plant into a biomass-fired combined heat and power (CHP) plant on its energetic and exergetic performances. A comprehensive thermodynamic model of the power plant was developed and validated against field data, resulting in less than 1% deviation between the model and the measurements for the main process parameters. The validated model was then used to predict the behaviour of the biomass CHP after retrofitting. The modelled CHP unit is coupled to a steam-explosion biomass upgrading plant, a biorefinery process, and a high-temperature heat network. 13 scenarios were studied. At constant boiler load, delivering heat to the considered heat clients can increase the total energy efficiency of the plant from 44% (electricity only) to 64%, while the total exergy efficiency decreases from 39% to 35%. A total energy efficiency of 67% could be reached by lowering the network temperature from 120◦C to 70◦C. Identifying the needed heat clients could, however, represent a limiting factor to reach such high efficiencies. For a constant power demand, increasing the boiler load from 80 to 100% in order to provide additional heat makes the total energy efficiency increase from 43% to 55%, while the total exergy efficiency decreases from 39% to 36%. |