par Dupriez, Maël
Référence Brussels Studies, 217
Publication Publié, 2026-05-20
Article révisé par les pairs
Résumé : This article compares four scenarios for reorganising the Brussels public transport network – the reference network, the full Metro 3 (Albert-North-Bordet), a truncated Metro 3 (Albert-North) and the Premetro+ – in order to estimate their respective effects on neighbourhood accessibility in terms of scheduled travel time, perceived travel time and number of transfers. The results show that although a full Metro 3 reduces scheduled journey times for certain trips, this comes at the cost of an increase in the average number of transfers, leading to a loss of accessibility for journeys to and from Neder-Over-Heembeek and Uccle. In other words, under the Metro 3 scenarios, gains in perceived time are offset – or even outweighed, in the truncated version – by perceived time losses. By contrast, the Premetro+ scenario achieves reductions both in journey times and in the average number of transfers. These findings highlight the importance of incorporating perceived time and transfers into the evaluation of public transport network reconfiguration projects and point to the need to give greater consideration to alternative options such as the Premetro+.