par Irshad, Aamir
;Aspell, Paul;Garcia, Luis Felipe Ramirez;Hayat, Mohsin;De Lentdecker, Gilles
;Licciulli, Francesco;Mastrapasqua, Paola;Petrow, Henri;Robert, Frédéric
;De Robertis, Giuseppe;Tuuva, Tuure
Référence Pos proceedings of science, 370
Publication Publié, 2019
;Aspell, Paul;Garcia, Luis Felipe Ramirez;Hayat, Mohsin;De Lentdecker, Gilles
;Licciulli, Francesco;Mastrapasqua, Paola;Petrow, Henri;Robert, Frédéric
;De Robertis, Giuseppe;Tuuva, TuureRéférence Pos proceedings of science, 370
Publication Publié, 2019
Article révisé par les pairs
| Résumé : | The CMS experiment is planning to install Gaseous Electron Multiplier (GEM) chambers as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end ASIC (VFAT3) has been produced in volume together with its hybrid PCB. This paper describes the design of a custom test bench for the production Quality Control (QC) of the VFAT3 hybrids. The full QC procedure incorporates calibration and performance measurements, database entries and statistical data analysis. The paper details the firmware and software functions to achieve the test time per hybrid to 2 minutes. The test system produced an overall 89% production yield including the wafer dicing and hybrid assembly losses. |



