« Back to Record
Ruiz, R., Stützle, T., & Vallada, E. (2005). An Iterated Greedy Heuristic for Flowshop Problems with Sequence Dependent Setup Times. XVIII European Chapter on Combinatorial Optimization (ECCO’05) (2005: Minsk, Belarus)
Citation APA
Permalink
Permalink
http://hdl.handle.net/2013/ULB-DIPOT:oai:dipot.ulb.ac.be:2013/77325



