« Back to Record
Ruiz, R., & Stützle, T. (2008). An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives. European journal of operational research, 187(3), 1143-1159. doi:10.1016/j.ejor.2006.07.029
Citation APA
Permalink
Permalink
http://hdl.handle.net/2013/ULB-DIPOT:oai:dipot.ulb.ac.be:2013/69617



