« Back to Record
Abbaneo, D., Barria, P., De Lentdecker, G., Lenzi, T., Maerschalk, T., Verhagen, E., Yifan, Y., Yonamine, R., Zenoni, F., et al. (2014). The triple-GEM project for the phase 2 upgrade of the CMS muon system. Pos proceedings of science., 065.
Citation APA
Permalink
Permalink
http://hdl.handle.net/2013/ULB-DIPOT:oai:dipot.ulb.ac.be:2013/247767



